Board Meeting Minutes- April 27, 2026

Monday, April 27, 2026 at 5:00 PM | 601 Cherokee Leavenworth, KS 66048-0576

Attendance

Directors in Attendance

  • Eric Peterson
  • William Daniels
  • Nick Poff
  • Camalla Leonhard
  • Eric Price

Directors Absent (Excused)

  • None

Staff in Attendance

  • Joel Mahnken, General Manager
  • Dana Splichal, Finance Manager
  • John Hodgden, Distribution Manager
  • Neil Seichepine, Treatment Manager

Others in Attendance

  • Steven Bass, P.E., Asst Bureau Chief, Road Design, KDOT
  • Steve Query, McClure Engineering Company

Call to Order

Director Peterson called the meeting to order at 4:57 PM.

Roll Call, Announcement of Quorum

Director Peterson noted that a quorum was present.

Request, Comments, Petitions by Members of the Public

None

Consider Utility Agreement with KDOT for the New Centennial Bridge

Steven Bass with KDOT was in attendance to answer questions from management and the Board. Discussion was held regarding costs and KDOT has approved payment of 88% of total costs incurred related to moving the main line. The Board’s position remains that the reimbursement should be 100%. Timeline was discussed and KDOT intends to let construction in August of 2027 with the understanding that all utilities will be out of the way at that point.

No action taken, the matter was tabled until KDOT R-O-W Acquisition contacts the Board or Staff.

Board Member Items Outside of Executive Session

None

Approve Minutes of April 13, 2026

Upon motion from Director Price and seconded by Director Poff, motion passed 5-0…

RESOLVED (No. 15670), that the Board approved the minutes from April 13, 2026 as presented.

Consideration of Consent Agenda

After brief discussion and upon motion from Director Leonhard and seconded by Director Price, motion passed 5-0…

RESOLVED (No. 15671), that the Board approved the consent agenda as presented.

Consider Approval of March 2026 Financial Statements

After discussion and upon motion from Director Daniels and seconded by Director Poff, motion passed 5-0…

RESOLVED (No. 15672), that the Board approved the March financial statements as presented.

Consider Bid Award for Lawrence Ave/9th St. Water Main Replacement

The Staff Engineer noted in the agenda item that the project is for replacing approximately 4,450 feet of existing water lines in an area bounded by Lawrence Ave, Spruce St, 10th Street, and Sherman Ave with 8” HDPE.

Informed the Board that on April 22nd management opened bids for the project, with four bidders submitting (tabulation was presented). Westland Construction, Inc. was the lowest bidder at $ 866, 771.50. Further noted that the bid was less than the Engineer’s Opinion of Probable Cost of $983,307.50. Management has worked with Westland Construction Inc in the past and recommend awarding them the bid.

After discussion and upon motion from Director Poff and seconded by Director Price, Director Daniels inquired about Westland’s performance in past jobs and was assured they had been completed to specifications and on time. Motion passed 5-0…

RESOLVED (No. 15673), that the Board accept the bid from Westland Construction, Inc. in the amount of $866,771.50 for the Lawrence Avenue & South 9th Street Water Main Replacement project and authorized the General Manager to execute the contract.

Divison Reports Presented:

Administration

  1. March financials
  2. Continue working on CPE for license renewal – due in June
  3. Updating/documenting various policies and procedures – Britni is working to digitalize past minutes
  4. KRWA Apprenticeship program presentation with KRWA personnel, along with John and Lisa
  5. Attended safety meeting on work zone safety
  6. Continue working with auditors

Distribution

Water Distribution Projects

  1. Lead & Copper Service Inventory
    • Total 13/37 for the year.
  2. Lawrence Ave
    • Bid opening completed.

Water Distribution Operations

  1. Conducted annual confined space/trench safety class
  2. Attended LVN High to speak about our industry to HS Jr.’s & Sr.’s
  3. Wilson Ave water line installed and in service, Vilas St. in-progress
  4. Began work on N 16th Kiowa to Dakota in-house WMR project

Water Treatment

Treatment Summary

  1. South Treatment Plant is back online after spring maintenance.
  2. High Service Pump #1 has been pulled to be rebuilt. (2026 CIP)
  3. Attended Safety Meeting April 20th “Work Zone Safety”
  4. April Usage through the 23rd: 84,257,806 gallons        Daily Average Usage: 3,829,900 gallons

General Manager

  • KMU Safety Training held April 20th on “Work Zone Safety”
    • Safety Committee continues to review & update our Safety Manual.
  • Water Tank Project
    • Waiting for KDHE to issue a loan amendment for a revised repayment schedule to closeout Project.
  • South Treatment Plant Resiliency Project
    • Submitted SRF pre-application to KDHE
    • Reviewed BRIC Grant NOFO for details needed for application.
    • Signed the engineering contract with Carollo Engineers.
    • Engineering “kick off” meeting scheduled for May 5th.
  • Opened bids on April 22nd for the Lawrence Ave./9th St. WMR Project.
  • Completed the 2026 AWWA Salary Survey.
  • Drafted Questions for KDOT on the New Centennial Bridge Project and emailed it to them.
  • Reviewing First Quarter CIP progress
  • Reviewing Emergency Response Plan updates.
  • An “Employee Appreciation Night” scheduled for KC Monarch’s baseball game May 30th.
  • City Commission to issue National Drinking Water Week May 3rd to 9th at their April 28th meeting.

Adjournment

Upon motion from Director Poff, seconded by Director Daniels, motion passed 5-0.

Director Peterson adjourned the meeting at 6:23 PM.